|
Combined cycle units may undergo damage
accumulation in their piping material. Our QAE NDI technology is now
available for online inspection and monitoring of the most critical problems in CC HEP:
1. Over-Spray Damage (Thermal Shock / Fatigue)
2. P91 - flaw detection at early stages.
The QAE NDI gives you more:
- Monitoring of the entire line, mapping of high-risk zones, and trending of flaw accumulation and development.
- More
inspection for less: Valve leak detection and hot walk down.
- No
need to wait for outage: installation and inspection are done on running
lines!!
|