Home  :  Fossil Power Plants  :  The Technology  :  Newsletter  :  About Us  :  Contact Us :  German Version  
Newsletter    
 


 

Vol. 2
 

End of year is coming and if you’re lucky you may have unused budgeted funds available. Why not use those funds instead of lose them!

Here is a great idea for how to use those funds this year while freeing up cash for next year’s budget.

Margan provides the on-line QAE NDI monitoring system which comprises of 3 steps;

  1. Hardware (can be applied to capital budget)
  2. Installation (can be applied to capital budget)
  3. Inspection (can be applied to maintenance or safety budget)

Depending on the type and amount of budget available, the entire project or either step 1 or steps 1 and 2 can be performed this year.

For Example: (400ft HRH line)

Not only are your funds used wisely, you will have obtained an on-line monitoring system that can provide an inspection of the entire line without taking a big bite out of future budgets.


QAE NDI has been revolutionizing the way power stations inspect their High Energy Piping:

  • Installation and Inspection on running lines (even for asbestos insulated lines)
  • No Scaffolds or tedious stripping of the line
  • Inspection of 100% of the line, including ID, OD, entire length and circumference and hanger performance under dynamic load
  • Provide useful information for preventive and predictive maintenance
  • Excellent agreement with conventional NDE and metallurgical investigation results
  • Significant savings over traditional NDE methods with better results as shown below:



 



 

Home  |  Fossil Power Plants  |  The Technology  |  Newsletter   |  About Us  |  Contact Us
©Margan, Inc. 2003